Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | ORL Power |
Model Number : | Customization |
Certification : | ISO9001/SGS/TUV/ASME/EN |
Price : | Contact me | Get Latest Price |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 500Ton/Tons per Month |
Delivery Time : | 50~100 Days |
35 Ton 200 MW Weight Scale Petroleum Waste Heat Garbage Gas Steam
Water Wall Panels ORL Power SGS with Hot Water
Description
A waterwall in a boiler is any furnace wall that is comprised of
refractory and tubes in a water-tube boiler. The tubes are evenly
spaced and generally connect to headers which in turn are connected
back to the main generating bank of the boiler. They serve a two
fold purpose here in that they capture heat that would otherwise
escape to the atmosphere and help heat the water in the boiler. And
they also help keep the refractory cool .This prevents spalling of
the refractory.
Our membrane water wall are manufactured with high grade raw
material and contemporary production equipment at our advanced
production unit. Various sizes, shapes and specifications, will
meet all the requirements of our clients . Further, cargoes are
delivered to the clients within lead time.
Specifications
Name | Membrane water panel |
Material | Carbon steel,Alloy steel,etc. |
Tube size | Φ38 - 76 mm, Customization |
Standard | ISO , ASME |
Model | Studded |
Dimension | Customization |
Manufacturing process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging |
Installation location | around the boiler combustion chamber |
Advantages of Membrane Water Wall
1). To guarantee the leakproofness of furnace wall and reduce the
air leak of combustion chamber.
2). To achieve the full water cooling of combustion chamber, and
the boiler accessories membrane water wall is benefit to prevent
coking under the condition of supplemental firing.
3). The thermal storage capacity is small, the warming of
combustion chamber is fast and the cooling is also fast, which
could shorten the cooling time of boiler’s start and furnace shut
down.
4). It is good to adopt top supported water cooled wall and it
could reduce the load of boiler framework, which is benefit to
overhang.
5) Compared with the bare tubes, the membrane water wall improves
the heat absorption capacity of tubes.
6) The factory direct boiler membrane water wall could improve the
Preliminary combination degree of boiler parts and reduce the
installation workload.
Company Information
Main Products
Workshop
Certifications
We have our boiler manufacturing plant, and obtain ISO9001:2008,
ISO3834, ASME S, U and GB stamp.
Packing&Shipping
Boiler Product Test
Impact test,The scene to examine the water-wall,Industrial TV
monitoring,Snake-like pipe water pressure test,Header endoscopic
detection,Header weld inspection
Testing Center
Company Business
Trading Process
1. Our Advantages:
A: The first and most important, we have our own tooling factory.
We can develop different panels according to your requirements or
samples.
B: We produce all products from the raw materials, so our price is
very competitive.
C: We have advanced production line and professional team.
D: Each order will be delivered on time.
E: We have more than 10 years of production experience.
F: Quality is controlled according to ISO9001:2000 system.
2. Our Services:
A: Your inquiry related to our product & price will be replied
within 24hours.
B: Well-trained & experienced stuff are to answer all your
inquiries in English of course.
C: Working time: at your service in 24 hours.
D: Good after-sale service offered, please get back if you got
question.
E: We respect the feedback after you receiving the goods. We will
handle your complaint within 48 hours.
How do order?
Step 1: Tell us your requirements
Step 2: Quoataion will be sent based on your requirement. Solution
will be recommended to
you as the alternative
Step 3: Negotiate and confrim each details for goods, trading terms
and so on, get agreement
and sign contract.
Step 4: Advanced payment and production
Step 5: Factory Examine Goods/ rectify and reform to meet the
requirements of contract.
Step 6: Balance payment and shipping
Step 7: Handing Shipping files to help clients get goods from
transporter in time.
Step 8: Clients get goods and go into warranty time
Contact:
ADD: No. 11, East Renmin Road, Zhangjiagang City, Jiangsu Province
China
Website: www. boiler-units.com
Email: info@orlpower.com
Tel: 86-0512-56770166
![]() |