Sign In | Join Free | My himfr.com
Home > Water Wall Panels >

High Temperature 10 Ton Membrane Water Wall Panels

    Buy cheap High Temperature 10 Ton Membrane Water Wall Panels from wholesalers
     
    Buy cheap High Temperature 10 Ton Membrane Water Wall Panels from wholesalers
    • Buy cheap High Temperature 10 Ton Membrane Water Wall Panels from wholesalers

    High Temperature 10 Ton Membrane Water Wall Panels

    Ask Lasest Price
    Brand Name : ORL Power
    Model Number : Customization
    Certification : ISO9001/SGS/TUV/ASME/EN
    Price : Negotiable
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    Supply Ability : 500Ton/Tons per Month
    Delivery Time : 50~100 Days
    • Product Details
    • Company Profile

    High Temperature 10 Ton Membrane Water Wall Panels

    High Temperature Hot Water Heaters Water Wall Panels


    Water Wall Panels Boiler Parts


    Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube.


    Water Wall Panels Introduction


    A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.


    Water Wall Panels Parameters


    NameMembrane water panel
    MaterialCarbon steel,Alloy steel,etc.
    Tube sizeΦ38 - 76 mm, Customization
    StandardISO , ASME
    ModelStudded
    DimensionCustomization
    Manufacturing processMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
    Installation locationaround the boiler combustion chamber

    Boiler Parts

    Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater


    High Temperature 10 Ton Membrane Water Wall Panels


    Quality High Temperature 10 Ton Membrane Water Wall Panels for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Suzhou orl power engineering co ., ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)